logo
Cases
Home > Cases > Dellok Zhenjie Energy Saving Technology Co.,Ltd. latest company case about SA179 Boiler Tube Bundle for Incinerator Waste Heat Boiler
EVENTS
CONTACT US
86-025-69525709
Contact Now

SA179 Boiler Tube Bundle for Incinerator Waste Heat Boiler

2026-11-12

latest company news about SA179 Boiler Tube Bundle for Incinerator Waste Heat Boiler

SA179 Boiler Tube Bundle for Incinerator Waste Heat Boiler

An incineration plant built waste heat boiler to recover flue gas heat and generate steam. Flue gas contains slight corrosive components and high temperature. DELLOK designed and manufactured SA179 boiler tube bundle with anti-vibration support structure. Tube-header welds were inspected by UT and MT. 100% hydrostatic test before delivery. The boiler bundle runs continuously to produce saturated steam for factory production. The waste heat recovery rate meets design expectation. 


Key Deliverables

  • SA179 carbon steel boiler tube bundle
  • Anti-vibration support, UT & MT weld inspection
  • Boiler pressure part test
  • Application:Incinerator waste heat boiler
  • Lead time:36 days

Meta Description SA179 boiler tube bundle for incinerator waste heat boiler, anti-vibration design, UT/MT weld test, steam generation.

Image Alt Text DELLOK SA179 boiler tube bundle incinerator waste heat case.


latest company case about SA179 Boiler Tube Bundle for Incinerator Waste Heat Boiler



Send your inquiry directly to us

Privacy Policy China Good Quality Heat Exchanger Tube Bundle Supplier. Copyright © 2026 Dellok Zhenjie Energy Saving Technology Co.,Ltd. . All Rights Reserved.