logo
News
Home > news > Company news about Boiler Tube Bundle Shipment — Custom Heat Exchange Bundle for Waste-to-Energy Power Generation Project
EVENTS
CONTACT US
86-025-69525709
Contact Now

Boiler Tube Bundle Shipment — Custom Heat Exchange Bundle for Waste-to-Energy Power Generation Project

2026-11-12

latest company news about Boiler Tube Bundle Shipment — Custom Heat Exchange Bundle for Waste-to-Energy Power Generation Project
Boiler Tube Bundles Successfully Delivered to Waste-to-Energy Plant

DELLOK has finished fabrication and delivered custom boiler tube bundles for a waste-to-energy power plant. These boiler heat exchange bundles are manufactured under ASME codes, designed for high-temperature flue gas heat transfer and energy recovery in waste incineration boilers.

Boiler tube bundles operate under continuous high temperature, thermal shock and ash erosion conditions. Our production strictly controls tube welding quality, assembly tolerance and anti-abrasion protection. Selected boiler tubes are treated with surface anti-wear coating on windward side, to resist ash particle scouring and extend service life. The bundle layout is optimized to balance heat transfer efficiency and reduce ash deposition.

Why Clients Choose Our Boiler Tube Bundles
  • ASME compliant design and fabrication for power boiler pressure parts
  • Anti-abrasion surface treatment for flue gas with ash content
  • Custom structure: straight tube, finned tube, serpentine tube bundles available
  • Strict welding inspection and pressure test before shipment
  • Complete documentation for power plant acceptance and filing
Manufacturing and Quality Control
  1. Boiler tube cutting, bending, welding and assembly
  2. Anti-wear coating spraying on erosion-prone areas
  3. Dimensional inspection for tube spacing, overall size and alignment
  4. 100% visual welding inspection, PMI identification
  5. Hydrostatic pressure test according to boiler design pressure
  6. Mill Test Certificate EN 10204 3.1; third-party witness inspection optional
Typical Technical Scope
Item Specification
Grade ASME SA210 Gr.A1 / SA179 / SA213
Standard ASME BPVC, GB/T, ISO
Tube type Plain boiler tube / finned boiler tube
Working condition High temperature flue gas, ash erosion
Test Hydrostatic test, VT, PMI, UT

Where These Bundles Are Used Boiler tube bundles are widely applied in waste-to-energy boilers, biomass boilers, thermal power economizers, industrial steam boilers and flue gas waste heat recovery systems. They recover heat from high-temperature flue gas to produce steam or preheat feedwater, improving overall power generation efficiency.

Packing & Delivery Finished bundles are wrapped with protective layers and fixed in heavy export wooden cases to avoid deformation during transit. Standard lead time: 30–40 days. Rush schedule available for power plant overhaul projects.

About Our Boiler Heat Exchange Capability DELLOK manufactures boiler tube bundles, economizer coils and boiler fin tubes for power and energy industry. We cooperate with boiler manufacturers and power plant maintenance teams globally.

Share your drawings and operating parameters, we will prepare a technical proposal and quotation quickly.

Meta Description DELLOK custom boiler tube bundles for waste-to-energy power plant, ASME standard, anti-abrasion coating, high temperature flue gas heat recovery, full pressure test for boiler pressure components.

Image Alt Text DELLOK boiler tube bundle for waste-to-energy power boiler, high temperature flue gas heat recovery assembly

latest company news about Boiler Tube Bundle Shipment — Custom Heat Exchange Bundle for Waste-to-Energy Power Generation Project  0

Send your inquiry directly to us

Privacy Policy China Good Quality Heat Exchanger Tube Bundle Supplier. Copyright © 2026 Dellok Zhenjie Energy Saving Technology Co.,Ltd. . All Rights Reserved.